BEST
Burning Plasma Experimental Superconducting Tokamak
Under ConstructionTokamak
China Fusion Energy has entered the final stage of assembling its Burning Plasma Experimental Superconducting Tokamak (BEST) at the Institute of Energy in the Hefei Comprehensive National Science Centre. BEST began construction in 2023 and is expected to be completed in 2027.
BEST is an intermediate phase between China’s Experimental Advanced Superconducting Tokamak (EAST) and the future Chinese Fusion Engineering Demo Reactor (CFEDR).
Images
Publications
- Machine learning aided neutron yield for dud detection based on JET and TFTR Deuterium-Tritium plasmas Aug 11, 2026 · Nuclear Fusion
- Features of fusion power measurements in next-generation magnetic plasma confinement experiments Jul 16, 2026 · Nuclear Fusion
- First reduced model for integrated computations of helicon wave heating and current drive in magnetic fusion plasmas Jul 14, 2026 · arXiv (physics.plasm-ph)
- Neutronics analyses of a diagnostic equatorial port of the next-generation burning plasma device BEST Jul 1, 2026 · Fusion Engineering and Design