TAE Technologies
TAE Technologies is developing a beam-driven field-reversed configuration machine targeting hydrogen-boron fusion. The company has developed multiple research machines and has spun off companies in the healthcare and electric vehicle industries.
News
- TAE Technologies Upgrades Norm Fusion Reactor to Underpin Commercial Development Nov 17, 2026 · TAE Technologies
- Characterization and implementation of a supersonic gas injector for fueling efficiency and impurity experiments in C-2W Nov 11, 2026 · TAE Technologies
Publications
- Special Issue Featuring Papers from the Innovation Network for Fusion Energy (INFUSE) Sep 2, 2026 · Fusion Science and Technology
- Validation of hybrid-PIC Simulations for Advanced Beam-Driven FRC Modeling Aug 19, 2026 · Nuclear Fusion
- Development of time-evolving NBCD simulation in the LHD, consistent with neutron and impurity measurements Jul 13, 2026 · Nuclear Fusion
Projects

A
1998–2000"A" was the first device made by TAE Technologies at the end of the 90's. It was built at the University of California, Irvine by TAE's founders and a group of students. The vacuum vessel was made out of a fiberglass sewer pipe. It was used for basic scientific and technological development of FRC devices.

B
2000–2004"B" was the second device made by TAE Technologies. Like A, it was used for the basic scientific and technological development of FRCs.

C-1
2004–2009C-1 was a field reversed configuration device built by TAE Technologies around 2004. It was a more robust device than A or B but it was not a full scale device as was C-2. C-1 was used to test Pulsed-Inductive Thrusters, a concept developed for space propulsion. C-1 could confine a plasma for 1 ms.

C-2
2009–2013The C-2 was a field reversed configuration device developed by TAE technologies. It was the first full scale device made by the company. A key accomplished goal of C-2 was to demonstrate a High Performance FRC (HPF), eg. improved confinement and stability compared to previous FRC efforts. Additionally the demonstration of heating and stability from Neutral Beam Injection was an important achievement of this device. In 2013, C-2 was upgraded to C-2U.

C-2U
2013–2015C-2U was an upgrade of the C-2 experiment. The neutral beam input power was upgraded from ~4MW (20keV Hydrogen) to 10+MW (15keV Hydrogen) and the injection angle was tilted to improve neutral beam to FRC coupling and reduce shine-through losses. Additionally, the edge-biasing capability inside each end-diverter was improved. The key accomplishment of C-2U was FRC stability limited only by hardware and stored energy (eg. neutral beam pulse duration and current sourcing capability of end guns). C-2U was shut down in 2015 to be upgraded again into C-2W

C-2W
2016–2019C-2W is an upgrade of the C-2U experiment. The neutral beam power was upgraded to up to ~21 MW and adjustable energies (15-40keV). Pulse duration was extended to up to 30ms. Inner diverters with upgraded edge-biasing electrode systems allowing for longer (30ms+) were installed. A number of other enhancements were added as well. In 2017, C-2W was renamed as "Norman" to honor late TAE Technologies co-founder, Norman Rostoker.
CBFR-SPS
Funding Received (Investment)
- Date December 18, 2025RoundDeal-Related FinancingAmount $200,000,000
- Date June 2, 2025Amount $150,000,000
- Date July 19, 2022RoundSeries G-2Amount $250,000,000Announcement
- Date April 8, 2021Amount $280,000,000Announcement
- Date May 20, 2016RoundSeries FAmount $375,000,000FundersAnnouncement
- Date January 1, 2015RoundSeries EAmount $127,500,000FundersAnnouncement
- Date February 1, 2013RoundSeries D-2Amount $127,000,000FundersAnnouncement
- Date August 1, 2010RoundSeries DAmount $50,000,000Announcement
- Date April 26, 2007RoundSeries C-2Amount $40,000,000Announcement
- Date November 14, 2005RoundSeries CAmount $39,413,060FundersAnnouncement
- Date September 1, 2003RoundSeries BAmount $6,670,000FundersAnnouncement
- Date December 13, 2002RoundSeries A-2Amount $1,140,000FundersAnnouncement
- Date September 19, 2001RoundSeries AAmount $3,790,000FundersAnnouncement
- Date January 1, 2000RoundCapitalizationAmount $1,700,000FundersAnnouncement
Funding Received (Nondilutive)
- Date September 10, 2025ProgramINFUSEFunders
- Date August 8, 2024ProgramINFUSEFunders
- Date July 25, 2023ProgramINFUSEFunders
- Date July 25, 2023ProgramINFUSEFunders
- Date June 15, 2022ProgramINFUSEFunders
- Date June 15, 2022ProgramINFUSEFunders
- Date June 4, 2021ProgramINFUSEFundersAnnouncement
- Date June 4, 2021ProgramINFUSEFunders
- Date November 25, 2020ProgramINFUSEFunders
- Date November 25, 2020ProgramINFUSEFunders
- Date August 14, 2020ProgramINFUSEFunders
- Date September 23, 2019ProgramINFUSEFunders
- Date September 23, 2019ProgramINFUSEFunders
- Date September 23, 2019ProgramINFUSEFunders
Jobs

Neutral Beam R&D Researcher
TAE Technologies
Foothill Ranch, California, United States
PhysicsFull-timeHybridFound 2 days ago
Researcher
TAE Technologies
Foothill Ranch, California, United States
Full-timeOn-siteFound 22 days ago
Senior Controls Engineer - PLC
TAE Technologies
Foothill Ranch, California, United States
Electrical EngineeringFull-timeOn-siteFound a month ago
Electrical Test Technician
TAE Technologies
Foothill Ranch, California, United States
TechnicianQuality & TestingFull-timeOn-siteFound a month ago
Mechanical Technician
TAE Technologies
Foothill Ranch, California, United States
TechnicianFull-timeOn-siteFound 2 months ago
Lead Electrical Engineer - Medical Beams
TAE Technologies
Foothill Ranch, California, United States
Electrical EngineeringFull-timeOn-siteFound 2 months ago
Sr Mechanical Engineer
TAE Technologies
Irvine, California, United States
Mechanical EngineeringFull-timeOn-siteFound 3 months ago
Lead Controls Engineer - PLC
TAE Technologies
Foothill Ranch, California, United States
Electrical EngineeringFull-timeOn-siteFound 3 months ago
Senior Design Engineer - Neutral Beams
TAE Technologies
Foothill Ranch, California, United States
Mechanical EngineeringFull-timeOn-siteFound 4 months ago
PCB Design Engineer
TAE Technologies
Foothill Ranch, California, United States
Full-timeOn-siteFound 4 months ago
Sr Scientist, Plasma Control
TAE Technologies
Irvine, California, United States
PhysicsFull-timeHybridFound 4 months ago
Scientist - Applied Laser Physics
TAE Technologies
Foothill Ranch, California, United States
PhysicsLasers & OpticsFull-timeHybridFound 5 months ago
Design Engineer - Medical Beams
TAE Technologies
Irvine, California, United States
Mechanical EngineeringFull-timeOn-siteFound 6 months ago
Accelerator Physicist - Medical Beams
TAE Technologies
Irvine, California, United States
PhysicsFull-timeHybridFound 6 months ago
Sr. Power Electronics Engineer
TAE Technologies
Foothill Ranch, California, United States
Electrical EngineeringFull-timeHybridFound 7 months ago
Sr Scientist - Neutral Beams
TAE Technologies
Foothill Ranch, California, United States
PhysicsFull-timeHybridFound 10 months ago
Do Epic Science | TAE Talent Community
TAE Technologies
Foothill Ranch, California, United States
Mechanical EngineeringPhysicsFull-timeOn-siteFound 10 months ago

